THE TRAIN BRAIN
Version 2.10 loaded 8/11/99
JAVA SIMULATIONS
Los Angeles Metrolink (Schedule Effective 5/17/99) Amtrak's San Diegan (Schedule Effective 5/16/99) San Diego Coaster (Schedule Effective 10/4/98) Atlanta's MARTA (Schedule Effective 5/10/99) Virginia's VRE (Schedule Effective 10/25/98) National Amtrak System (Old Schedule from 1997) Disneyland (Average day from 1997) Western Pacific Airlines (Average day from 1997)
Instructions for The Train Brain
LOADING TIMES
The first time The Train Brain applet is run it will take approximately 2 to 3 minutes (at 28800bps) to load the Java class files. During this time you should see a large gray rectangle on your screen. Once the browser has cached the Java class files, t he next load of any version of The Train Brain should take about 30 to 45 seconds at 28800bps