Reynolds Transit Software

THE TRAIN BRAIN
Version 2.01 loaded 5/12/99


JAVA SIMULATIONS
The Train Brain now requires a Java 1.1 Enabled Browser!

Los Angeles Metrolink (Schedule Effective 10/26/98) 
Amtrak's San Diegan (Schedule Effective 10/25/98) 
San Diego Coaster (Schedule Effective 10/4/98) 
Atlanta's MARTA (Schedule Effective 5/10/99) 
Virginia's VRE (Schedule Effective 10/25/98) 
National Amtrak System  (Old Schedule from 1997) 
Disneyland  (Average day from 1997)
Western Pacific Airlines (Average day from 1997) 

Instructions for The Train Brain


NON-JAVA TRIP PLANNER
Los Angeles Metrolink (Schedule Effective 5/17/99)



LOADING TIMES
The first time The Train Brain applet is run it will take approximately 2 to 3 minutes (at 28800bps) to load the Java class files. During this time you should see a large gray rectangle on your screen. Once the browser has cached the Java class files, t he next load of any version of The Train Brain should take about 30 to 45 seconds at 28800bps